About us

A primary objective of J. G. Hale Construction is to deliver major construction projects to the satisfaction of our customers; while respecting the environment and communities in which we operate. We understand that customer satisfaction and continuous improvement are the key drivers for our business

We commit to:

  • Operate our business to ensure that at all times we meet or exceed our customers’ needs and their expectation in performance, service and quality
  • Continually improve our quality performance and promote good quality methods as part of good business practice, both internally and externally
  • Comply with all relevant statutory and regulatory requirements Set measurable targets to achieve our quality objective, which will be monitored and reviewed as necessary to ensure continuous improvement
  • Operate a Quality Management System (QMS) which, as a minimum, meets the requirements of ISO 9001:2015
  • Display and communicate this policy Provide training for all parties with the organisation to ensure that not only the policy is understood but all employees understand their effect on quality and the company’s performance
  • Carry out regular reviews to ensure that the system stays suitable, up to date and that any necessary improvements are implemented and effective

testtimonial

Hale Construction built over 200 homes for us. Their attention to detail and quality of services was the best in the business.

Joe Fraiser - Sevenoaks Modular

Our Team

Lorem Ipsum. Proin gravida nibh vel velit auctor aliquet. Aenean sollicitudin, lorem quis
bibendum auctor, nisi elit consequat ipsum, nec sagittis sem nibh id elit.

Fun Facts

Lorem Ipsum. Proin gravida nibh vel velit auctor aliquet. Aenean sollicitudin lorem.

1
Projects delivered
1
Problems solved
1
Questions answered
1
Happy customers

Our Services

Lorem Ipsum. Proin gravida nibh vel velit auctor aliquet. Aenean sollicitudin, lorem quis
bibendum auctor, nisi elit consequat ipsum, nec sagittis sem nibh id elit.

House Building
Lorem Ipsum. Proin gravida nibh vel velit auctor aliquet. Aenean sollicitudin, lorem bibendum auctor, nisi elit consequat ipsum, sagittis sem nibh id elit.
Development Management
Lorem Ipsum. Proin gravida nibh vel velit auctor aliquet. Aenean sollicitudin, lorem bibendum auctor, nisi elit consequat ipsum, sagittis sem nibh id elit.
Ground Works
Lorem Ipsum. Proin gravida nibh vel velit auctor aliquet. Aenean sollicitudin, lorem bibendum auctor, nisi elit consequat ipsum, sagittis sem nibh id elit.

Latest Posts

Lorem Ipsum. Proin gravida nibh vel velit auctor aliquet. Aenean sollicitudin, lorem quis
bibendum auctor, nisi elit consequat ipsum, nec sagittis sem nibh id elit.

Biomass Boiler

Here are SO Modular, we are delighted to unveil our new biomass boiler at our headquarters, the result of a significant investment but one which moves use closer to becoming completely self sufficient in terms of our energy and our production process.

The cutting edge biomass boiler was installed by energy specialist Novalux Energy. It is fuelled by our offcuts and wood shavings, a natural biproduct of the production process and will re-use 90% of the fuel into usable heat.

It works by burning the fuel at high temperatures to produce heat, or thermal energy. This thermal energy is transferred to a heat exchanger which provides you with heat for space or processes. The technology also utilises carbon filters to filter out impurities in its emissions to ensure they are not harmful to the local environment.

Economy Minister and Senedd Member, Vaughan Gething

We were delighted to welcome the Economy Minister and Senedd Member, Vaughan Gething, to SO Modular’s new state-of-the-art, off-site manufacturing facility, located at the ‘Old Metal Box’ factory in Neath.

Mr Gething was given a guided tour around the new facility, ahead of its grand opening later in the year. During his visit, we showed him our latest investment in new equipment and explained our plans for the site – where we will be producing our sustainable, innovative, modular wood panel systems and roof trusses for use in the wider construction industry.

The regeneration of the ‘Old Metal Box’ factory into our new facility has been made possible due to a substantial £900,000 Property Business Development Gran through the European Regional Development Fundt.In addition, loan funding support worth over £2.85 million, provided through the Welsh Government’s Innovative Housing Programme (IHP) to Tai Tarian Housing Association, has facilitated further investment in plant and machinery to increase our capacity.

PRODUCTION CAPACITY

We have increased our production capacity by 700% thanks to our significant six-figure investment in new machinery at our new 350,000 sqft timber and modular manufacturing facility in Neath, South Wales.

The development of the facility began in April 2020 and is set for an official launch at the end of summer 2021. Once completed, with all the new machinery installed and running, the site will immediately be able to expand from its current production capacity of 500 homes per year to 3,500 homes per year on a single shift.

The timber and modular manufacturing facility will also be a zero-carbon, sustainable site, creating a number of skilled employment opportunities in the local area.

We have been able to fund the purchase of our new machinery through an Innovative Housing Programme (IHP) loan with Tai Tarian – one of the largest social landlords in Wales.

The new machinery is considerably more efficient – both in terms of speed and energy usage – than that currently being used. It will also produce less waste and will contribute towards us sustainably manufacturing low carbon homes.

The new machinery includes a treatment tank, Production Lines, a biomass boiler, a Hundegger TURBO-Drive II Saw, a vertical saw and a factory blow insulation machine.

The Hundegger TURBO-Drive II Saw will speed up timber processes, increase accuracy and reduce waste with the use of computer software technology. The saw’s optimisation software means that any offcuts it produces are automatically cut into smaller standardised pieces, which can then be used as other functional aspects of modular joist and cassette manufacture.

The biomass boiler will ensure waste timber is used to reheat the facilities, and avoid it being transported to landfill for disposal. As well as heating the factory and offices, the boiler is also used to dry treated timber in our new in-house treatment tank, helping us reduce our fuel costs and aiding us in our goal to create a sustainable, renewable process for timber frame manufacturing.